+8613863508899
Search

Equipment Installation Of Drum Screen

Jan 18, 2021

Equipment installation: embedded steel plate. Before installation, Drum Screen the steel plate should be embedded according to the requirements of the equipment installation drawing, Drum Screen and the upper plane of the embedded steel plate should be on the same plane. The pre-embedded steel plates and foot bolts required for installation shall be provided by the installation unit. The installation of the screen body. Determine the installation position of the screen body according to the location of the equipment inlet and outlet. Install the foundation bracket. Mount both ends of the screen body on the foundation support by hoisting, Drum Screen adjust the installation angle of the screen body to the design angle, Drum Screen and finally perform fixed welding.


Connect the inlet and outlet. Connect the sealing plate of the lower bracket of the screen. Rotate the drum screening cylinder by hand to avoid excessive resistance or jamming, Drum Screen otherwise the cause should be found out and adjusted in time. After the roller screen leaves the factory, Drum Screen if it is installed more than 6 months ago, the bearing of the large shaft must be removed and cleaned before installation, Drum Screen and new grease (No. 2 lithium grease) must be injected.


Send Inquiry